Tel : +86-18630605462 Email : info@bjhyhouse.com
Leading manufacturer of container house, with 150+ global partners
Call+86-18630605462
Emailinfo@bjhyhouse.com
Tel : +86-18630605462 Email : info@bjhyhouse.com
Project Overview
During the 2020 Spring Festival, as the COVID-19 outbreak suddenly intensified, the government of Anyang City, Henan Province, urgently required the construction of a specialized epidemic hospital — the “Xiaotangshan” Hospital of Anyang Fifth People’s Hospital — to centralize the treatment of COVID-19 patients.
This project became a model of rapid-response medical infrastructure. As a strategic centralized procurement partner of China Construction Fifth Engineering Division (Henan), JHHY HOUSE, upon receiving the task, completed the production, transportation, and installation of 154 container hospital units in just 10 days. The total construction area reached 2,772 square meters, comprising 164 rooms, including 124 fully functional patient wards.
The project demonstrates how modular construction can be deployed at unprecedented speed without compromising quality, safety, or functionality, providing critical support during a public health emergency.

Location
Anyang City, Henan Province, China
Project Scale
Design, production, and installation of 154 sets container houses
Construction of 124 fully equipped patient isolation wards
Additional rooms for staff, management, and auxiliary functions
Integration of medical-grade ventilation, water, and electrical systems
Turnkey delivery of a temporary hospital ready for immediate operation
Full project execution in just 10 days under emergency conditions
Solution
To meet the urgent demand for isolation facilities, a modular, prefabricated building solution was employed. Each container house was designed to standardized specifications while maintaining flexible adaptability, allowing for rapid on-site assembly and ensuring compliance with hospital usage standards.
Key measures included:
Factory pre-fabrication to accelerate delivery timelines
Standardized modular room design for infection control and patient care
Efficient logistics and installation coordination involving 80 management staff and over 500 construction personnel
Advanced medical infrastructure integration, including HVAC systems, water supply, and electrical networks
Rapid deployment strategy allowing full operational readiness within 10 days
This solution demonstrates the scalability, speed, and reliability of modular construction for emergency healthcare projects.

Highlights
Ultra-Rapid Deployment: Completed in just 10 days from order to operational hospital
Emergency Response Capability: Supports centralized treatment of COVID-19 patients
High-Quality Modular Design: Combines speed with hospital-grade functionality
Large-Scale Coordination: 80 management staff and 500+ personnel worked around the clock
Comprehensive Facilities: Fully equipped wards, management rooms, and auxiliary spaces
dvanced Medical Systems: Integrated ventilation, electrical, and water supply for safe patient care
Proven Scalability: Demonstrates the power of modular construction for urgent public health projects

Client Value
This project delivered a fully functional, temporary hospital in record time, directly supporting public health efforts during a critical period.
Key client benefits include:
Immediate operational readiness to treat COVID-19 patients
Minimized risk to construction and hospital staff through modular prefabrication
High-quality, hygienic patient environment in a short timeframe
Strengthened public trust and institutional reputation through rapid delivery
Scalable approach that can be replicated for future emergency healthcare needs
The Anyang Fifth People’s Hospital project exemplifies how modular construction can save lives, enhance operational efficiency, and provide strategic value during public health emergencies.
leave a message
Scan to wechat :
Scan to whatsapp :